Skip to main content
Loading…
This section is included in your selections.

Industrial users connecting to the City’s process water reuse facilities shall also be required to connect to the City’s municipal water system. Industrial users shall further be required to secure all necessary permits prior to connection to the process water reuse facilities. In addition, industrial users shall install at their sole expense, City-approved monitoring stations, including meters and automatic samplers on their wastewater discharge lines for purposes of monitoring the volume, strength and characteristics of their plant discharges into the City’s system. The meters shall be connected to the City instrumentation and control system. Industrial users may be required to provide screening, pH control, and/or pretreatment of user’s waste. The monitoring stations and acquired data shall be open to City employees at all times for their inspection and the data obtained from the monitoring stations shall be used by the City to determine the actual variable operating costs as set forth in PMC 13.55.020(2) based upon the actual volume, strength and characteristics of the user’s discharges. [Ord. 3291 § 2, 1998; Code 1970 § 13.41A.010.]