Each user must notify the Public Works Director of any significant changes to the user’s operations or system which might alter the nature, quality, or volume of its wastewater. This notification must be made at least 30 days before the desired change and be sent to both the Public Works Director and the receiving POTW if they are different. In such cases:

(1) The Public Works Director may require the user to submit whatever information is needed to evaluate the changed condition. The Public Works Director may also require a new or revised wastewater discharge permit application under PMC 13.90.230.

(2) The Public Works Director may issue, reissue, or modify a wastewater discharge permit applying the procedures of PMC 13.90.270 through 13.90.340 in response to a user’s notice under this section. [Ord. 4169 § 1, 2014; Code 1970 § 13.62.060(E).]