Skip to main content
Loading…
This section is included in your selections.

Whenever permitted construction of public works infrastructure (mainline water and sewer extensions, streets and right-of-way construction, including drainage systems and public utilities), as determined by the Public Works Director or his/her designee, requires inspection to assure compliance with City construction standards, the applicant or permittee shall be responsible for payment of a minimum inspection fee for the first hour of inspection time (as set forth in Chapter 3.35 PMC) and thereafter for the City’s hourly costs (salary, benefits and transportation) of providing such inspection services. Inspection fees/costs shall be billed by the City on a periodic basis and payments shall be due within 30 days of billing. [Ord. 3979, 2010; Code 1970 § 14.08.030.]