(1) No building permit for a structure other than a temporary contractor’s office or temporary storage building shall be issued for a lot or parcel within an approved subdivision until all required infrastructure improvements which will serve the subject lot or parcel have been constructed and accepted by the City Engineer or have been bonded or otherwise guaranteed; provided, that the Fire Chief has determined that adequate fire protection for the construction exists.

(2) No occupancy permit for a structure other than a temporary contractor’s office or temporary storage building shall be issued for a structure on a lot or parcel within an approved subdivision prior to final inspection and approval of all required infrastructure improvements that will serve such lot. [Ord. 3398 § 2, 1999; Code 1970 § 26.28.090.]