Skip to main content
Loading…
This section is included in your selections.

(1) A survey must be performed and filed with every binding site plan. The survey must be conducted by or under the supervision of a Washington State registered land surveyor. The surveyor shall certify on the binding site plan that it is a true and correct representation of lands actually surveyed and the survey was done in accordance with state law.

(2) In all binding site plans, lot corner survey pins must be set before final approval can be granted.

(3) In all binding site plans, perimeter monuments must be set before final approval can be granted.

(4) In all binding site plans, control monuments must be set before final acceptance of public improvements. [Ord. 3398 § 2, 1999; Code 1970 § 26.40.050.]